home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / daily / 930626.ZIP / 930626.DFC
Text File  |  1993-07-04  |  16KB  |  435 lines

  1. "930626.DFC" (15151 bytes) was created on 06-26-93
  2.  
  3. 26-Jun-93 Daily File Collection
  4.    These files were added or updated between 25-Jun-93 at 21:00:00 {Central}
  5.                                          and 26-Jun-93 at 21:00:13.
  6.  
  7. =--=--=START=--=--= NASA Spacelink File Name:6_2_18_5.TXT
  8.  
  9.  NOTE: This file is too large {27399 bytes} for inclusion in this collection.
  10.     The first line of the file:
  11.  
  12. - Current Two-Line Element Sets #218 -
  13.  
  14.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  15. =--=--=-END-=--=--=
  16.  
  17. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_45_11_13.TXT
  18.  
  19. MCC Status #11
  20.  
  21. MISSION CONTROL STATUS REPORT
  22. STS-57 Status Report #11
  23.  
  24. Saturday, June 26, 1993, 5 a.m. CDT
  25.  
  26.  
  27. With a primary objective of their flight -- the retrieval of the EURECA
  28. satellite -- completed, Endeavour's crew will turn its attention back to the
  29. host of experiments aboard the shuttle and in the Spacehab module.
  30.  
  31. The crew was awakened at 1:07 a.m. after eight and a half hours of sleep for
  32. the sixth day of the flight to the song "Holiday" performed by Madonna, played
  33. to suggest the crew take some time to celebrate the success of their mission.
  34.  
  35. Activities today for the crew will include work with crystal growth, spacecraft
  36. technology and biological experiments in the Spacehab. Among the experiments
  37. will be an evaluation of maintenance equipment, including an oscilloscope and
  38. electrical test meter, that may be used on Space Station Freedom.
  39.  
  40. In addition, the crew will run an experiment in transferring fluids in
  41. weightlessness without creating bubbles in the fluid.  The experiment, called
  42. the Fluid Aquisition and Resupply Experiment, or FARE, studies filters and
  43. processes that may lead to methods of refueling spacecraft in orbit and
  44. transfers water between two foot-diameter transparent tanks on Endeavour's
  45. middeck.  During some tranfers, Endeavour's steering jets will be fired to
  46. observe the disturbance created by them to the process.
  47.  
  48. As an evaluation of one activity that may be required for a shuttle to spend
  49. long periods docked at the space station, Pilot Brian Duffy will turn off one
  50. of Endeavour's three electricity-generating fuel cells today.  The fuel cell
  51. will be restarted in two days.
  52.  
  53. At about 12:22 p.m. central today, Commander Ron Grabe and Payload Commander
  54. David Low will be interviewed by the Cable News Network about their flight.
  55. Endeavour is in a 256 by 209 nautical mile orbit, circling Earth each 93
  56. minutes.
  57.  
  58. --end--
  59.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  60. =--=--=-END-=--=--=
  61.  
  62. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_45_11_14.TXT
  63.  
  64. MISSION CONTROL STATUS REPORT 
  65.  
  66. MISSION CONTROL STATUS REPORT
  67. STS-57 Status Report #12
  68.  
  69. Saturday June 26, 1993, 2 p.m. CDT 
  70.   The Endeavour crew completed flight day six activities about 1:30 p.m.  CDT
  71. today.  Saturday's work focused on several experiments in the Spacehab module
  72. and one experiment carried in the middeck.
  73.  
  74. The diagnostic equipment portion of the Tools and Diagnostics System experiment
  75. was performed by Nancy Sherlock. Using electronics test instruments including
  76. an oscilloscope and electrical test meter, Sherlock conducted tests on a mock
  77. printed circuit board and communicated with ground controllers via computer
  78. messages on suggested repair procedures and their results.
  79.  
  80. Brian Duffy and Jeff Wisoff worked on several test setups of the Fluid
  81. Acquisition and Resupply Experiment, or FARE, which evaluates techniques that
  82. could be used to develop methods of refueling spacecraft in orbit.  By
  83. transferring water between two transparent tanks on Endeavour's middeck,
  84. engineers can evaluate how the fluids behave while the shuttle's steering jets
  85. are fired for small maneuvers.
  86.  
  87. Janice Voss worked on the Liquid Encapsulated Melt Zone, or LEMZ, experiment
  88. which uses a process called floating zone crystal growth.  The low- gravity
  89. conditions of space flight permit large crystals to be grown without touching a
  90. container.  This particular experiment uses a liquid to surround the indium
  91. bismuth material as it is melted, then solidified into crystal form.
  92. Researchers expect to produce large single indium crystals that may pave the
  93. way for use of the LEMZ hardware to test materials of commercial interest on
  94. future missions.  If processes can be refined to commercially produce large,
  95. pure crystals such as gallium arsenide, they could contribute to the next
  96. generation of high-speed computer, optics and sensor systems.
  97.  
  98. The test calling for shutting down one of Endeavour's fuel cells was terminated
  99. when the hydrogen reactant valve would not close.  Fuel cell number three was
  100. restarted without incident and is performing normally.  Flight controllers are
  101. evaluating whether to try the test again later in the mission.  The study is
  102. designed to expand the electrical generation engineers' knowledge of fuel cell
  103. performance when turned off and then back on while in space.  At least three
  104. tests on separate shuttle flights are planned in preparation for prolonged
  105. shuttle stays at the space station when a fuel cell would need to be
  106. temporarily turned off.
  107.  
  108. Endeavour continues to perform well, allowing the crew to dedicate its work
  109. days to the Spacehab module experiments.
  110.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  111. =--=--=-END-=--=--=
  112.  
  113. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_45_2.TXT
  114.  
  115. STS-57 KEPLERIAN ORBITAL ELEMENTS
  116.  
  117. SPACELINK NOTE: Spacelink contains an IBM MS-DOS/Windows program (V2L9322.ZIP)
  118. that will convert M-50 state vectors into the 2-line format preferred by many
  119. callers.  Enter IBM at the GO TO prompt and check out the section on satellite
  120. tracking programs.
  121.  
  122.  
  123. STS-57 element set GSFC-017 (orbit 69)
  124.  
  125.  
  126.  
  127. STS-57
  128. 1 22684U 93 37  A 93176.94756451 0.00002573  00000-0  47390-4 0   176
  129. 2 22684  28.4570 283.0694 0061195  44.6441 315.9065 15.44272481   699
  130.  
  131. Satellite: STS-57
  132. Catalog number: 22684
  133. Epoch time:      93176.94756451         (25 JUN 93   22:44:29.57 UTC)
  134. Element set:     GSFC-017
  135. Inclination:       28.4570 deg
  136. RA of node:       283.0694 deg          Space Shuttle Flight STS-57
  137. Eccentricity:    0.0061195                  Keplerian Elements
  138. Arg of perigee:    44.6441 deg
  139. Mean anomaly:     315.9065 deg
  140. Mean motion:   15.44272481 rev/day      Semi-major Axis: 6811.6487 Km
  141. Decay rate:       0.26E-04 rev/day*2    Apogee  Alt:        474.94 Km
  142. Epoch rev:              69              Perigee Alt:        391.58 Km
  143.  
  144.  
  145. NOTE - This element set is based on NORAD element set # 017.
  146.        The spacecraft has been propagated to the next ascending
  147.        node, and the orbit number has been adjusted to bring it
  148.        into agreement with the NASA numbering convention.
  149.  
  150. R.A. Parise, Goddard Space Flight Center
  151.  
  152.  
  153.  
  154.  
  155.                                   STS-57
  156.                          PREDICTED STATE VECTORS
  157.                            ON ORBIT OPERATIONS
  158.                  (Posted 06/26/93 by Steve Stich)
  159.  
  160.  
  161. The following vector for the flight of STS-57 is provided by NASA Johnson
  162. Space Center, Flight Design and Dynamics Division for use in ground track
  163. plotting programs.
  164.  
  165.  
  166. Lift-off Time : 1993/172/13:07:21.953
  167. Lift-off Date : 06/21/93
  168.  
  169.                               ORBITER VECTOR
  170.  
  171. Vector Time (GMT) : 177/21:07:21.950
  172. Vector Time (MET) : 005/08:00:00.000
  173. Orbit Count : 083
  174. Weight : 239953.0 LBS
  175. Drag Coefficient : 2.00
  176. Drag Area : 2750.0 SQ FT
  177.  
  178.      M50 Elements                           Keplerian Elements
  179. -----------------------                 --------------------------
  180. X    =     5603970.2  FT                A          = 3680.7997 NM
  181. Y    =    21240306.2  FT                E          =  0.006553
  182. Z    =     4187341.5  FT                I  (M50)   =  28.22558 DEG
  183. Xdot = -21188.817781  FT/S              Wp (M50)   =  67.19919 DEG
  184. Ydot =   7905.537909  FT/S              RAAN (M50) = 276.02094 DEG
  185. Zdot = -10865.682740  FT/S            / N (True)   =  89.47759 DEG
  186.                            Anomalies  \ M (Mean)   =  88.72677 DEG
  187.  
  188.                                         Ha         = 257.16    NM
  189.                                         Hp         = 208.29    NM
  190.  
  191.  
  192.  
  193. Mean of 1950 (M50)   : Inertial, right-handed Cartesian system whose
  194. Coordinate System      origin is the center of the earth.  The epoch
  195.                        is the beginning of the Besselian year 1950.
  196.                        X axis: Mean vernal equinox of epoch
  197.                        Z axis: Earth's mean rotational axis of epoch
  198.                        Y axis: Completes right-hand system
  199.  
  200. A:    Semi-major axis
  201. E:    Eccentricity                         N:    True anomaly
  202. I:    Inclination                          M:    Mean anomaly
  203. Wp:   Argument of perigee                  Ha:   Height of apogee
  204. RAAN: Right ascension of ascending node    Hp:   Height of perigee
  205.  
  206.  
  207.  
  208. Questions regarding these postings may be addressed to Roger Simpson,
  209. Mail Code DM4, L.  B. J.  Space Center, Houston, Texas 77058,
  210. Telephone (713) 483-1928.
  211.  
  212. Dear Customer,  We are in the process of reviewing the contents of
  213. this product and are interested in determining if it fits your needs.
  214. If you use these state vectors, please drop us a postcard and
  215. let us know what we can do to improve your use of this product.
  216. POSTED BY SSTICH AT VMSPFHOU ON VMSPFHOU.VMBOARDS:PAONEWS
  217.  
  218.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  219. =--=--=-END-=--=--=
  220.  
  221. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_45_6.TXT
  222.  
  223. STS-57 TV SKED, REV K 
  224.  
  225.  
  226.  
  227.  
  228.  
  229.  
  230. ***********************************************************************
  231.  
  232.                           NASA SELECT TV SCHEDULE
  233.                                   STS-57
  234.                                  6/25/93
  235.                                   REV K
  236.  
  237. ***********************************************************************
  238.  
  239.  
  240. NASA Select programming can be accessed through GE Satcom F2R,
  241. transponder 13.  The frequency is 3960 MHz with an orbital position
  242. of 72 degrees West Longitude.  This is a full transponder service
  243. and will be operational 24 hours a day.
  244.  
  245. Two hour edited programs of each flight day will be replayed for Hawaii
  246. and Alaska on Telstar 301, transponder 9, channel 18.  The orbital
  247. position is 96 degrees West Longitude, with a frequency of 4060 MHz.
  248. Audio is on 6.2 & 6.8 MHz.  The programs will begin on launch day and
  249. continue through landing airing at 11:01PM Central Time.
  250.  
  251. This NASA Select Television Schedule of mission coverage is available
  252. on COMSTORE, the mission TV schedule computer bulletin board service.
  253. Call 713/483-5817, and follow the prompts to access this service.
  254.  
  255. NOTE: The STS-57 launch occurred on Monday, June 21st at 8:07AM CDT
  256.  
  257. *  Denotes changes from last revision.
  258.  
  259.  
  260. --------------------------- Friday, June 25 ---------------------------
  261.                                  FD5
  262.  
  263.  
  264. ORBIT                SUBJECT              SITE       MET       CDT
  265. -----                -------              ----       ---       ---
  266.  
  267.  
  268. 70   * REPLAY OF FD5 ACTIVITIES           JSC     04/11:53    08:00 PM
  269.  
  270.  
  271. --------------------------- Saturday, June 26 -------------------------
  272.                                  FD6
  273.  
  274.  
  275.        NOTE: ADDITIONAL SPACEHAB ACTIVITIES MAY BE DOWNLINKED
  276.              THROUGHOUT THE DAY.
  277.  
  278.  
  279. 73   * CREW WAKE UP                               04/17:00    01:07 AM
  280.  
  281.  
  282.  
  283.  
  284.  
  285.  
  286.  
  287.  
  288.  
  289.  
  290. 75     P/TV02 EFE ACTIVITIES              TDRE    04/19:50    03:57 AM
  291.        T=10:00
  292.  
  293. 76     P/TV02 EFE ACTIVITIES              TDRW       21:45    05:52 AM
  294.        T=15:00 (May not have Ku coverage)
  295.  
  296. 78     MISSION STATUS BRIEFING            JSC     04/23:53    08:00 AM
  297.  
  298. 78     P/TV08 FARE TEST #5 DOWNLINK       TDRW    05/00:00    08:07 AM
  299.        OPPORTUNITY (May be pre-empted
  300.        by MSB)
  301.        T=19:00
  302.  
  303. 78     P/TV02 LEMZ-3 ACTIVITIES           TDRW    05/01:03    09:10 AM
  304.        T=5:00
  305.  
  306. 79     MISSION UPDATE                     JSC     05/02:53    11:00 AM
  307.  
  308. 80   * P/TV06 CNN INTERVIEW               TDRW    05/04:15    12:22 PM
  309.        T=15:00
  310.  
  311. 82   * CREW SLEEP                                 05/07:30    03:37 PM
  312.  
  313. 84     REPLAY OF FD6 ACTIVITIES           JSC     05/10:23    06:30 PM
  314.  
  315. 87   * CREW WAKE UP                               05/15:30    11:37 PM
  316.  
  317.  
  318. -------------------------- Sunday, June 27 ----------------------------
  319.                                  FD7
  320.  
  321.  
  322.        NOTE: ADDITIONAL SPACEHAB ACTIVITIES MAY BE DOWNLINKED
  323.        THROUGHOUT THE DAY.
  324.  
  325.  
  326. 90     P/TV02 EFE ACTIVITIES              TDRE    05/19:00    03:07 AM
  327.        T=15:00
  328.  
  329. 92     MISSION STATUS BRIEFING            JSC     05/23:53    08:00 AM
  330.  
  331. 92     P/TV02 LEMZ-4 ACTIVITIES           TDRE    06/00:00    08:07 AM
  332.        T=5:00
  333.  
  334. 95     MISSION UPDATE                     JSC     06/03:53    12:00 PM
  335.  
  336. 97   * CREW SLEEP                                 06/06:30    02:37 PM
  337.  
  338. 99     REPLAY OF FD7 ACTIVITIES           JSC     06/09:23    05:30 PM
  339.  
  340. 102  * CREW WAKE UP                               06/14:30    10:37 PM
  341.  
  342.  
  343.  
  344.  
  345.  
  346.  
  347.  
  348.  
  349.  
  350.  
  351.  
  352. -------------------------- Monday, June 28 ----------------------------
  353.                                  FD8
  354.  
  355.  
  356.        NOTE: SPACEHAB ACTIVITIES MAY BE DOWNLINKED THROUGOUT THE DAY.
  357.  
  358.  
  359. 107    CREW CONFERENCE                    TDRW    06/22:00    06:07 AM
  360.        T=20:00
  361.  
  362. 108    MISSION STATUS BRIEFING            JSC     06/23:53    08:00 AM
  363.  
  364. 110    Ku BAND STOW                               07/02:20    10:27 AM
  365.        (Not televised)
  366.  
  367. 110    REPLAY OF NASA ADMINSITRATOR       JSC     07/02:23    10:30 AM
  368.        ADDRESS
  369.        T=35:00
  370.  
  371. 110    MISSION UPDATE                     JSC     07/03:53    12:00 PM
  372.  
  373. 112  * CREW SLEEP                                 07/06:00    02:07 PM
  374.  
  375. 114    REPLAY OF FD8 ACTIVITIES           JSC     07/09:23    05:30 PM
  376.  
  377. 117  * CREW WAKE UP                               07/14:00    10:07 PM
  378.  
  379.  
  380. ---------------------------- Tuesday, June 29 -------------------------
  381.                                  FD9
  382.  
  383.  
  384. 122  * DEORBIT BURN (Not Televised)               07/22:32    06:39 AM
  385.  
  386. 123  * LANDING                            KSC     07/23:39    07:46 AM
  387.  
  388.        POST LANDING PRESS CONFERENCE      KSC     L+TBD
  389.  
  390.        LANDING REPLAYS                    KSC     L+TBD
  391.  
  392.  
  393.  
  394.  
  395.  
  396.  
  397. ------------------------  DEFINITION OF TERMS  ------------------------
  398.  
  399. CDT:     Central Daylight Time
  400. EFE:     Environmental control and life support system
  401.  
  402.  
  403.  
  404.  
  405.  
  406.  
  407.  
  408.  
  409.  
  410.          Flight Experiment
  411. EURECA:  European Retrievable Carrier
  412. FARE:    Fluid Acquisition and Resupply Experiment
  413. FD:      Flight Day
  414. JSC:     Johnson Space Center
  415. KSC:     Kennedy Space Center
  416. LEMZ:    Liquid Encapsulated Melt Zone
  417. MET:     Mission elapsed Time.  The time which begins at the moment
  418.          of launch and is read: Days/Hours:minutes. Launch= 00/00:00
  419. MSB:     Mission Status Briefing
  420. P/TV:    Photo/Television Scene
  421. RMS:     Remote Manipulator System
  422. SCG:     Solution Crystal Growth
  423. SPACEHAB:Commercial module carried in payload bay
  424. STS:     Space Transportation System
  425. TDRE,W:  Tracking and Data Relay Satellite, both East and West
  426.          longitudes
  427. TDRSS:   Tracking and Data Relay Satellite System
  428. T=:      Time event duration equals
  429. VTR:     Video Tape Recorder
  430.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  431. =--=--=-END-=--=--=
  432.  
  433. =--=END OF COLLECTION---COLLECTED 5 FILES---COMPLETED 21:06:56=--=
  434.  
  435.